Project cost consulting service unit tender supplement announcement.
Release time:
2023-10-11 14:18
Source:
Comprehensive Scoring Details
|
Serial Number |
Scoring Factors and Weights |
Score |
Scoring criteria |
Say Ming |
|
1 |
Quotation35% |
35 points |
Meet the requirements of this bidding document, and the price of the consulting service unit with the lowest final quotation is divided into full marks.35 points; The rest of the unit price, every 1% higher, deducted 0.3 points. |
Common scoring factors |
|
2 |
Project understanding, understanding and analysis of key and difficult points9% |
9 points |
According to the consulting service unit's understanding, understanding and difficulty analysis of this project (including but not limited① project understanding; ② analysis of important and difficult points; ③ solutions to important and difficult points), 9 points for those with comprehensive content, strong feasibility, strong pertinence, and fully meeting or better than the actual needs of the project, and 3 points for those with missing items, missing items or items that do not meet the actual needs of the project, until the deduction is completed. |
Technical scoring factors |
|
3 |
Overall Service Plan10% |
10 points |
According to the overall service plan provided by the consulting service unit for the project.[Including but not limited to ① service objectives; ② service work arrangements; ③ personnel arrangements; ④ follow-up audit principles and basis; ⑤ follow-up audit workflow (procedures);⑥ follow-up audit efficiency assurance measures; ⑦ follow-up audit dispute handling methods; ⑧ emergency handling,Comprehensive content, strong feasibility, strong pertinence, fully meet or better than the actual needs of the project.10 points, there are missing items, missing items or a deduction that is not in line with the actual project2 points, until the deduction is completed. |
Technical scoring factors |
|
4 |
Quality Control Scheme10% |
10 points |
According to the quality control plan provided by the consulting service unit for this project (including but not limited① service quality control measures; ② rationalization proposals in the implementation process),Comprehensive content, strong feasibility, strong pertinence, fully meet or better than the actual needs of the project.10 points, there are missing items, missing items or a deduction that is not in line with the actual project2 points, until the deduction is completed. |
Technical scoring factors |
|
5 |
internal management system10% |
10 points |
According to the internal management system provided by the consulting service unit for this project (including but not limited① Operation rules; ② Responsibilities of each department; ③ Confidentiality system; ④ Review system; ⑤ Risk management system; ⑥ File management system; ⑦ Professional discipline management system),Comprehensive content, strong feasibility, strong pertinence, fully meet or better than the actual needs of the project.10 points, there are missing items, missing items or a deduction that is not in line with the actual project2 points, until the deduction is completed. |
Technical scoring factors |
|
6 |
Schedule Control Scheme6% |
6 points |
According to the progress control plan provided by the consulting service unit for this project (including but not limited① schedule arrangement; ② progress guarantee measures for important links),Comprehensive content, strong feasibility, strong pertinence, fully meet or better than the actual needs of the project.6 points, there are missing items, missing items or a deduction that is not in line with the actual project2 points, until the deduction is completed. |
Technical scoring factors |
|
7 |
Stavisioning10% |
10 points |
1. Project leader: 3 points for national registered cost engineer or first-class registered cost engineer qualification, 1 point for intermediate technical title and 1 point for senior and above technical title, up to 5 points for this item. |
Common scoring factors |
|
2. Other full-time technical personnel: 1 point for each person with a national registered cost engineer or a first-class registered cost engineer, and 1 point for a senior technical title. This out of 5 points. |
||||
|
Note: All the above personnel are not allowed to score repeatedly and provide relevant certification materials. |
||||
|
8 |
Performance10% |
10 points |
Consulting Service UnitFrom January 1, 2020 to the deadline for submission of response documents, 2 points shall be awarded for each project completion settlement audit performance, and 10 points shall be awarded for this item at most; |
Common scoring factors |
|
Note: Provide a copy of the contract or agreement, and the time for performance confirmation shall be subject to the time of signing the contract. |
